COMPLETED PROJECT


   
NO
PROJECT

YEAR COMPLETED
 
DEVELOPER
81
Cadangan Membina Sebuah Bangunan Empat Tingkat Serta Satu Tingkat Basement Ibusawat Telekom Di Putrajaya, Selangor Darul Ehsan.
1999
  Telekom Malaysia Berhad
82
Electrical Installation For Phase 2B 82 Units Double Storey Semi-D (Type A, B, C, D) At Shah Alam.
1999
  Gamuda Development Sdn. Bhd.
83
Proposed Electrical Works For 163 Units 2&3 Storey Terrace House (Phase 1), Precinct 8, Putrajaya.
1999
  Putrajaya Holding
84
Bangunan Perniagaan 4 Tingkat Dan 1 Tingkat Tempat Letak Kereta Separa Bawah Tanah Di Atas Lot 29508, Jalan Tun Mohd Fuad, Taman Tun Dr. Ismail.
1999
  PNB Property Management Sdn. Bhd.
85
Proposed Electrical Work, Telephone, IT, Fire Fighting And Air-Cond For UPM-MTDC (Phase 3A), UPM-MTDC (Phase 3B), UPM-MTDC (Phase 3C) And UKM-MTDC
1999
  UPM UKM MDTC
86
Cadangan Mengubahsuai Dalaman Dan Pintu Masuk Utama Di Pusat Membeli-belah Sediada (Yang Mengandungi 6 Tingkat Ruang Membeli-belah dan 3 Tingkat Basement), Jln. Tun. H.S.Lee
1998
  Uda Holding Sdn. Bhd.
87
5 Blok Rumah Pangsa Kos Rendah 5 Tingkat 184 Unit Rumah Pangsa Dan 8 Unit Rumah Kedai Di Tingkat Bawah Blok 1 & 2, Di Lot 4448 & 4437 Daerah Petaling, Selangor.
1999
  Negara Property Realty Sdn. Bhd.
88
Cadangan Mereka-Bentuk, Membina Dan Menyiapkan (13 Block) 1260 Units Rumah Pangsa, Seksyen 6, Pusat Bandar Sungai Buloh, Selangor Darul Ehsan.
1999
  PKNS
89
137 Units Teras Satu And 98 Units Rumah Teras Dua Tingkat.
1999
  Lembah Beringin S/B
90
240 units Rumah Teres 2 tingkat (RT-2) Dan 1 Unit Pencawang Elektrik Di Fasa 11B, Mukim Serendah
1999
  Noble Right Sdn. Bhd.
91
Maintenance Depot at Leburaya Damansara Puchong Tol Plaza 2
1998
  Lebuhraya D'sara Puchong (LDP)
92
Electrical And Telephone Services For Cadangan Projek Rumah Murah Pekerja Ladang Di Dengkel.
1998
  Putra Holding
93
Bandar Kota Kemuning (Parcel 2 - Fasa 2D & 2E), 122 units, 94 Units dan 1 unit PE TNB, Seksyen 31, Shah Alam.
1998
  Hicom Gamuda Development Sdn. Bhd.
94
194 Unit Semi-D & 4 Unit Bangalow, Seremban Two (phase 2), Electrical & Telephone Services
1998
  Seremban 2
95
Electrical Services for BB Plaza Renovation works
1997
  BB Plaza
96
240 Units Medium Cost Apartment Phase A8, Bandar Kinrara, Selangor.
1999
  Kinrara
97
100 Unit Low-Medium Cost Flats (Phase 5A) Sungai Buloh, Bukit Raman Putra.
1998
  Hong Leong Housing
98
Main contract works Suite, Lobby, Lobby Lounge, Regent Club Lounge, Function Rooms and Lift Elevator.
1998
  Regent Hotel
99
To Supply, Delivery, Installation Testing And Intercom and Telephone Services For Proposed 23 Storey Condominium for Surplus Ent. Sdn Bhd.
1997
  MBF Property Services
100
KLIA-Package RA07 - Aviation Emergency Services, Meteorological Station, Airfield Safer Unit and Control Posts.
  1997   KLIA
           
Page 1 | 2 | 3 | 4 | 5 | 6 | 7
   


Home | About Us | Services | Reference | Contact Us
Asencon Elektrik Sdn Bhd. © 2009